Pioneers in Floating Wind Deployment

A track record from concept to implementation at sea on pilot farm

Project support for Floating Offshore Wind

Project development phase, Pre-FEED

  • Wind resources evaluation, Soil and Meteocean conditions review, wind farm layout

  • Wind turbine characteristics,

  • Floater selection, Turbine-Floater-Mooring Coupling modal system set-up

  • Floater structural design, fatigue life optimisation

  • Mooring system design and package specifications (chain, synthetic rope, steel wire)

  • Key mooring components: mooring connector, spring buoy, load reduction devices, tensioner, turret, bearing arrangement, electric swivel

  • Floater assembly, towing and Installation method, mooring deployment and hook-up

  • Cold-eye review

  • ITT reviews

Project execution

  • FEED scope preparation, Engineering Master Document Register, Class review cycle

  • Project risk assessment

  • Procurement, assembly and installation schedule,

  • EPCI cost estimation

source : principle power